Gap analysis + 9-phase plan (m11p1-p9) from the experimental m8p10 cluster to an
enterprise-grade one, grounded in the 2026-06-10 live stress-test baselines:
replicated /signals ~90/s vs sharded 3,669/s vs embedded ~82ns, plus four
live-observed incidents (restart leadership amnesia, side-channel broadcast bugs,
breaker-eaten heal, the 178ms ship) promoted to requirements. Phases: perf floor,
one replicated log, quorum acks (G4), election+fencing (G5), membership/discovery,
sharding x RF, security, observability/ops, chaos CI — each with a testable
Ref-A exit gate; release waves v0.9 credible / v1.0 scalable / v1.1 enterprise.
Indexed in docs/README.md; pointer from ROADMAP's Post-M8 Follow-ups.