tidaldb/docs/planning
jordan.washburn b16025b8b2 feat: pluggable cluster transport + multi-process E2E test harness
Three changes closing M8 gaps identified during verification:

1. ROADMAP.md: Mark m8p8 and m8p10 as PARTIAL (not COMPLETE).
   Added Known Gaps table (G1: in-process transport, G2: tier-3
   tests, G3: hash inconsistency).

2. SimulatedCluster transport now pluggable via ClusterConfig.transports.
   Default (None) uses new ChannelTransport (crossbeam, same behavior).
   When Some, accepts external transports (e.g., GrpcTransport from
   tidal-net). Updated redeliver_missed to use &dyn Transport.
   Zero regressions: all 1209 lib + 8 m8_uat tests pass unchanged.

3. Multi-process E2E test harness (tidal-server/tests/cluster_e2e.rs).
   ClusterHarness spawns real tidal-server cluster OS processes,
   allocates dynamic ports, generates topology YAML, polls health,
   and cleans up via SIGTERM. Two tests: smoke (write + converge +
   verify follower reads) and promote (leader change + continued writes).
   Feature-gated behind cluster-e2e.
2026-04-11 19:57:25 -06:00
..
milestone-0 feat: complete M1 signal engine — m0p3 samples/docs, m1p5 TidalDb API, examples, and periodic checkpoint 2026-02-20 22:45:10 -07:00
milestone-1 feat: complete Milestone 5 — full-text search, RRF fusion, and creator search 2026-02-21 23:53:16 -07:00
milestone-2 feat: complete M1 signal engine — m0p3 samples/docs, m1p5 TidalDb API, examples, and periodic checkpoint 2026-02-20 22:45:10 -07:00
milestone-3 feat: complete Milestones 2–4 — RETRIEVE query, vector index, ranking profiles, diversity, entity system, sessions 2026-02-21 16:24:48 -07:00
milestone-5 feat: complete Milestone 5 — full-text search, RRF fusion, and creator search 2026-02-21 23:53:16 -07:00
milestone-7 feat: complete M6-M7 + Enterprise Readiness milestones; split oversized source files per CODING_GUIDELINES §9 2026-02-23 22:41:16 -07:00
milestone-8 feat: complete M8 replication primitives + forage enhancements + docs 2026-02-24 13:17:19 -07:00
milestone-p feat: M0p1 runtime skeleton, M0p2 tooling & diagnostics, m1p4 signal ledger 2026-02-20 20:32:00 -07:00
architecture-review.md feat: implement Milestone 1 phases 1-3 — schema, WAL, and storage layer 2026-02-20 16:43:24 -07:00
PRODUCT_ROADMAP.md feat: M0p1 runtime skeleton, M0p2 tooling & diagnostics, m1p4 signal ledger 2026-02-20 20:32:00 -07:00
roadmap-cohort-analysis.md feat: implement Milestone 1 phases 1-3 — schema, WAL, and storage layer 2026-02-20 16:43:24 -07:00
ROADMAP.md feat: pluggable cluster transport + multi-process E2E test harness 2026-04-11 19:57:25 -06:00
site-cohort-analysis.md chore: initialize tidalDB repository with schema foundation and standards 2026-02-20 12:52:20 -07:00